Home  /  Quality

Measured, documented, signed off.

ISO 9001 certified, with CMM, hardness and surface testing on site.

A coordinate measuring machine probing a machined component.

Certification

What we hold, and what we don’t.

Certified

ISO 9001

Certificate number, revision, issuing body and expiry to confirm — and the PDF to publish here.

Not currently held

ISO 13485

Confirm whether held, in progress or not planned. Medical buyers will ask.

Not currently held

IATF 16949

Confirm status if automotive work is a target sector.

A technician measuring a machined part with a vernier caliper.

Inspection

Measured on the floor,
not at the gate.

Quality control sits inside manufacturing here, so a dimension in question gets answered the same shift.

Inspection equipment in-house
Coordinate measuring machineMake and model to confirm
Surface testerTo confirm
Hardness testing machineTo confirm
Micrometers & verniersFull range
Air, dial and bore gaugesIn-house
CalibrationInterval and traceable standard to confirm
A hand on the control panel of a CNC machine.
Same shift

The person who measures it can also correct it.

Documentation

What arrives
with the parts.

Incoming inspection rejects paperwork as often as parts. Tell us at RFQ stage and it will be in the box.

  • Dimensional inspection report against the drawing — format to confirm
  • First article inspection before batch release — AS9102 or own format
  • Material test certificate with heat or lot number — scope to confirm
  • Certificate of conformity — to confirm
  • PPAP / ISIR and lot traceability — levels and method to confirm

How we keep it there

Capability designed in,
not corrected later.

  1. 01

    Simulated first

    CAD-CAM and 3D simulation prove the toolpath before material is committed.

  2. 02

    First article gates the batch

    Nothing runs on until the first piece is signed off against the drawing.

  3. 03

    In-process checks

    At set frequencies through the run — sampling plan to confirm.

  4. 04

    Non-conformance recorded

    Root cause goes back into the process sheet, not into a drawer.

Need a sample inspection report?

Tell us what your incoming inspection asks for and we will show you.

On-time delivery
00%
Quality acceptance
00%
Complaints, last FY
00
Quote turnaround
0 days